If you can trigger its operation from the power supply, that is it runs when the power is supplied to it, you can automate it via a smart power socket and programing and scheduling what you want is pretty easy. Problem is that a lot of equipment cannot be controlled by the power supply and must be triggered by its own controls, but if you have the equipment it is easy to test for that.