so the contraversial post a while back got me interested in manifolding.. the well assembled and explained manifolding primer was helpful (way more than going through the old mainlining compilation which was informative but a bit scattered) but lacked in some minor details.
i am trying it with a sativa dominant strain and am 3 weeks into a drain to waste hydro setup (amended promix) and can use some tips.
i am a bit behind cause i was waiting for node separation before topping the first time.. after a full three weeks i topped at the second node above cotyldon leaves, the first set of three leaves.
do people still feed the same level of fertilizer while setting up mainlines and supercropping etc..?
does raising the lights help get some stretch out of the plants for longer nodes or would it cause issues in another regard?
i'd like to top twice more on either side to get 8 main colas and prune away all other growth.. but the writeup saying everything should be setup in two weeks was a bit ambitious i think, as well as using a more efficient growing method.. in a drain to waste or soil setup how ong does it take people to have their manifolds setup and ready to stretch?
i am trying it with a sativa dominant strain and am 3 weeks into a drain to waste hydro setup (amended promix) and can use some tips.
i am a bit behind cause i was waiting for node separation before topping the first time.. after a full three weeks i topped at the second node above cotyldon leaves, the first set of three leaves.
do people still feed the same level of fertilizer while setting up mainlines and supercropping etc..?
does raising the lights help get some stretch out of the plants for longer nodes or would it cause issues in another regard?
i'd like to top twice more on either side to get 8 main colas and prune away all other growth.. but the writeup saying everything should be setup in two weeks was a bit ambitious i think, as well as using a more efficient growing method.. in a drain to waste or soil setup how ong does it take people to have their manifolds setup and ready to stretch?
Comment